{"id":189,"date":"2026-03-05T05:45:57","date_gmt":"2026-03-05T05:45:57","guid":{"rendered":"https:\/\/changyun.themedemo.top\/?p=189"},"modified":"2026-05-29T07:43:50","modified_gmt":"2026-05-29T07:43:50","slug":"wind-power-cable-conveyor-project-application1","status":"publish","type":"post","link":"https:\/\/changyun.themedemo.top\/fr\/wind-power-cable-conveyor-project-application1\/","title":{"rendered":"Cable Conveyor &#038; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan"},"content":{"rendered":"<p>Overview<\/p>\n<p>The Matiari to Lahore \u00b1660 kV HVDC Transmission Line Project is one of the most important power transmission infrastructure projects in Pakistan under the China-Pakistan Economic Corridor (CPEC).<\/p>\n<p>The project connects Matiari in Sindh Province with Lahore in Punjab Province through an approximately 878 km ultra-high-voltage direct current (HVDC) transmission line with a transmission capacity of 4,000 MW.<\/p>\n<p>As a large-scale long-distance transmission line project, efficient cable installation equipment played a critical role during construction. Advanced cable conveyor and cable pusher systems were widely required to improve cable laying efficiency, reduce labor intensity, and protect high-value power cables during installation.<\/p>\n<p>&#8212;<\/p>\n<p>Cable Conveyor and Cable Pusher Applications in HVDC Transmission Projects<\/p>\n<p>Large HVDC transmission projects involve massive quantities of power cables, communication cables, and auxiliary control cables. Traditional manual cable pulling methods are inefficient, labor-intensive, and can easily damage expensive cables.<\/p>\n<p>Modern cable conveyor systems and cable pusher machines are essential equipment for power transmission construction contractors.<\/p>\n<p>Cable conveyor equipment is mainly used for:<\/p>\n<p>* Long-distance cable laying<br \/>\n* Underground cable installation<br \/>\n* HVDC power cable transportation<br \/>\n* Tunnel cable installation<br \/>\n* Cable trench construction<br \/>\n* Substation cable deployment<br \/>\n* Mountain and complex terrain cable installation<\/p>\n<p>Cable pusher machines help contractors safely move heavy cables while minimizing friction and cable tension.<\/p>\n<p>&#8212;<\/p>\n<p>Why Cable Conveyors Are Important for Long-Distance Transmission Projects<\/p>\n<p>For ultra-long transmission line projects such as the Pakistan Matiari-Lahore HVDC project, construction companies require reliable cable installation equipment to improve construction speed and reduce operational costs.<\/p>\n<p>Compared with manual cable pulling, cable conveyor systems offer major advantages:<\/p>\n<p>Higher Installation Efficiency<\/p>\n<p>Cable conveyors significantly improve cable laying speed for long-distance transmission projects.<\/p>\n<p>Reduced Cable Damage<\/p>\n<p>Rubber-driven cable conveyor machines reduce friction and protect cable insulation during transportation.<\/p>\n<p>Lower Labor Costs<\/p>\n<p>Cable pusher systems reduce manpower requirements and improve jobsite safety.<\/p>\n<p>Better Performance in Complex Terrain<\/p>\n<p>Cable conveyors can operate in tunnels, trenches, mountains, and uneven construction environments.<\/p>\n<p>Stable Cable Tension Control<\/p>\n<p>Professional cable pusher machines help maintain stable pulling force during cable installation.<\/p>\n<p>&#8212;<\/p>\n<p>Cable Conveyor Solutions for HVDC Power Projects<\/p>\n<p>For large HVDC infrastructure projects, contractors usually require heavy-duty cable conveyor equipment with high pulling capacity and durable industrial structure.<\/p>\n<p>Typical equipment used in transmission projects includes:<\/p>\n<p>* Electric cable conveyor<br \/>\n* Hydraulic cable pusher<br \/>\n* Heavy-duty cable roller conveyor<br \/>\n* Underground cable conveyor system<br \/>\n* Transmission line cable pusher<br \/>\n* High-voltage cable installation machine<\/p>\n<p>These machines are widely used in:<\/p>\n<p>* HVDC transmission projects<br \/>\n* Power station construction<br \/>\n* Substation projects<br \/>\n* Utility cable installation<br \/>\n* Renewable energy projects<br \/>\n* Underground power infrastructure<\/p>\n<p>&#8212;<\/p>\n<p>Professional Cable Conveyor Manufacturer for Global Power Projects<\/p>\n<p>As a professional cable conveyor manufacturer, Keepapexpower provides reliable cable pusher and cable conveyor solutions for power transmission and utility infrastructure projects worldwide.<\/p>\n<p>Our cable conveyor equipment is designed for:<\/p>\n<p>* High-voltage cable installation<br \/>\n* Long-distance cable laying<br \/>\n* Underground cable construction<br \/>\n* Utility and power grid projects<br \/>\n* Transmission line engineering contractors<\/p>\n<p>Our advantages include:<\/p>\n<p>* Heavy-duty industrial design<br \/>\n* Stable cable pushing performance<br \/>\n* Customizable solutions<br \/>\n* Durable rubber driving wheels<br \/>\n* Easy operation and maintenance<br \/>\n* Support for large-diameter cables<br \/>\n* Suitable for complex construction environments<\/p>\n<p>&#8212;<\/p>\n<p>Global Demand for Cable Conveyor and Cable Pusher Equipment<\/p>\n<p>With the rapid development of global energy infrastructure, demand for cable conveyor systems continues to increase in:<\/p>\n<p>* HVDC transmission projects<br \/>\n* Renewable energy power plants<br \/>\n* Smart grid construction<br \/>\n* Urban underground cable systems<br \/>\n* Cross-country power transmission projects<\/p>\n<p>Countries in Asia, the Middle East, Africa, and South America are investing heavily in large-scale transmission infrastructure, creating strong demand for professional cable installation equipment.<\/p>\n<p>Cable conveyor and cable pusher machines have become essential equipment for modern power engineering projects.<\/p>\n<p>&#8212;<\/p>\n<p>Conclusion<\/p>\n<p>The Karachi-Lahore \u00b1660 kV HVDC Transmission Project demonstrates the growing importance of efficient cable installation equipment i<\/p>","protected":false},"excerpt":{"rendered":"<p>Overview The Matiari to Lahore \u00b1660 kV HVDC Transmission Line Project is one of the most important power transmission infrastructure projects in Pakistan under the China-Pakistan Economic Corridor (CPEC). The project connects Matiari in Sindh Province with Lahore in Punjab Province through an approximately 878 km ultra-high-voltage direct current (HVDC) transmission line with a transmission [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1842,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_thinkrank_schema_form_data":"","_thinkrank_selected_schema_type":"","_thinkrank_additional_schemas":"","_thinkrank_canonical_url":"","_thinkrank_og_title":"","_thinkrank_og_description":"","_thinkrank_og_image":"","_thinkrank_twitter_title":"","_thinkrank_twitter_description":"","_thinkrank_twitter_image":"","_thinkrank_imported_from":"","_thinkrank_focus_keywords":[],"_thinkrank_focus_keyword":"","_thinkrank_robots_meta_enabled":0,"_thinkrank_robots_meta":"","_thinkrank_advanced_robots_meta":"","_thinkrank_exclude_from_search":0,"_thinkrank_exclude_from_archives":0,"_thinkrank_primary_category":0,"footnotes":""},"categories":[18],"tags":[],"class_list":["post-189","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cable Conveyor &amp; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/changyun.themedemo.top\/fr\/wind-power-cable-conveyor-project-application1\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cable Conveyor &amp; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top\" \/>\n<meta property=\"og:description\" content=\"Overview The Matiari to Lahore \u00b1660 kV HVDC Transmission Line Project is one of the most important power transmission infrastructure projects in Pakistan under the China-Pakistan Economic Corridor (CPEC). The project connects Matiari in Sindh Province with Lahore in Punjab Province through an approximately 878 km ultra-high-voltage direct current (HVDC) transmission line with a transmission [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/changyun.themedemo.top\/fr\/wind-power-cable-conveyor-project-application1\/\" \/>\n<meta property=\"og:site_name\" content=\"changyun.themedemo.top\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-05T05:45:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T07:43:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"haozhuti@gmail.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"haozhuti@gmail.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/\"},\"author\":{\"name\":\"haozhuti@gmail.com\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#\\\/schema\\\/person\\\/5da7331c430c515db6e711f4977a5059\"},\"headline\":\"Cable Conveyor &#038; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan\",\"datePublished\":\"2026-03-05T05:45:57+00:00\",\"dateModified\":\"2026-05-29T07:43:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/\"},\"wordCount\":608,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/1-260413095G63P.jpg\",\"articleSection\":[\"Application\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/\",\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/\",\"name\":\"Cable Conveyor & Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/1-260413095G63P.jpg\",\"datePublished\":\"2026-03-05T05:45:57+00:00\",\"dateModified\":\"2026-05-29T07:43:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#primaryimage\",\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/1-260413095G63P.jpg\",\"contentUrl\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/1-260413095G63P.jpg\",\"width\":600,\"height\":400,\"caption\":\"1-260413095G63P\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/wind-power-cable-conveyor-project-application1\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/changyun.themedemo.top\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cable Conveyor &#038; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#website\",\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/\",\"name\":\"changyun.themedemo.top\",\"description\":\"KeepApexpower\",\"publisher\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/changyun.themedemo.top\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#organization\",\"name\":\"changyun.themedemo.top\",\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/changyun.themedemo.top\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/logo-2.svg\",\"width\":133,\"height\":94,\"caption\":\"changyun.themedemo.top\"},\"image\":{\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/changyun.themedemo.top\\\/#\\\/schema\\\/person\\\/5da7331c430c515db6e711f4977a5059\",\"name\":\"haozhuti@gmail.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"caption\":\"haozhuti@gmail.com\"},\"sameAs\":[\"https:\\\/\\\/changyun.themedemo.top\"],\"url\":\"https:\\\/\\\/changyun.themedemo.top\\\/fr\\\/author\\\/haozhutigmail-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cable Conveyor & Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/changyun.themedemo.top\/fr\/wind-power-cable-conveyor-project-application1\/","og_locale":"fr_FR","og_type":"article","og_title":"Cable Conveyor & Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top","og_description":"Overview The Matiari to Lahore \u00b1660 kV HVDC Transmission Line Project is one of the most important power transmission infrastructure projects in Pakistan under the China-Pakistan Economic Corridor (CPEC). The project connects Matiari in Sindh Province with Lahore in Punjab Province through an approximately 878 km ultra-high-voltage direct current (HVDC) transmission line with a transmission [&hellip;]","og_url":"https:\/\/changyun.themedemo.top\/fr\/wind-power-cable-conveyor-project-application1\/","og_site_name":"changyun.themedemo.top","article_published_time":"2026-03-05T05:45:57+00:00","article_modified_time":"2026-05-29T07:43:50+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg","type":"image\/jpeg"}],"author":"haozhuti@gmail.com","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"haozhuti@gmail.com","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#article","isPartOf":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/"},"author":{"name":"haozhuti@gmail.com","@id":"https:\/\/changyun.themedemo.top\/#\/schema\/person\/5da7331c430c515db6e711f4977a5059"},"headline":"Cable Conveyor &#038; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan","datePublished":"2026-03-05T05:45:57+00:00","dateModified":"2026-05-29T07:43:50+00:00","mainEntityOfPage":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/"},"wordCount":608,"commentCount":0,"publisher":{"@id":"https:\/\/changyun.themedemo.top\/#organization"},"image":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#primaryimage"},"thumbnailUrl":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg","articleSection":["Application"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/","url":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/","name":"Cable Conveyor & Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan - changyun.themedemo.top","isPartOf":{"@id":"https:\/\/changyun.themedemo.top\/#website"},"primaryImageOfPage":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#primaryimage"},"image":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#primaryimage"},"thumbnailUrl":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg","datePublished":"2026-03-05T05:45:57+00:00","dateModified":"2026-05-29T07:43:50+00:00","breadcrumb":{"@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#primaryimage","url":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg","contentUrl":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/03\/1-260413095G63P.jpg","width":600,"height":400,"caption":"1-260413095G63P"},{"@type":"BreadcrumbList","@id":"https:\/\/changyun.themedemo.top\/wind-power-cable-conveyor-project-application1\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/changyun.themedemo.top\/"},{"@type":"ListItem","position":2,"name":"Cable Conveyor &#038; Cable Pusher Solution for the Karachi-Lahore \u00b1660 kV HVDC Transmission Project in Pakistan"}]},{"@type":"WebSite","@id":"https:\/\/changyun.themedemo.top\/#website","url":"https:\/\/changyun.themedemo.top\/","name":"changyun.themedemo.top","description":"KeepApexpower","publisher":{"@id":"https:\/\/changyun.themedemo.top\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/changyun.themedemo.top\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/changyun.themedemo.top\/#organization","name":"changyun.themedemo.top","url":"https:\/\/changyun.themedemo.top\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/changyun.themedemo.top\/#\/schema\/logo\/image\/","url":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/02\/logo-2.svg","contentUrl":"https:\/\/changyun.themedemo.top\/wp-content\/uploads\/2026\/02\/logo-2.svg","width":133,"height":94,"caption":"changyun.themedemo.top"},"image":{"@id":"https:\/\/changyun.themedemo.top\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/changyun.themedemo.top\/#\/schema\/person\/5da7331c430c515db6e711f4977a5059","name":"haozhuti@gmail.com","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","caption":"haozhuti@gmail.com"},"sameAs":["https:\/\/changyun.themedemo.top"],"url":"https:\/\/changyun.themedemo.top\/fr\/author\/haozhutigmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/posts\/189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/comments?post=189"}],"version-history":[{"count":4,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/posts\/189\/revisions"}],"predecessor-version":[{"id":1843,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/posts\/189\/revisions\/1843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/media\/1842"}],"wp:attachment":[{"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/media?parent=189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/categories?post=189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/changyun.themedemo.top\/fr\/wp-json\/wp\/v2\/tags?post=189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}