Project: Power line relocation in a new district of a certain China city
Challenge: The cable trench was narrow and winding, with a working space barely wide enough for a single person to pass sideways. Traditional manual cable pulling was almost impossible, causing severe delays in the construction schedule.
Solution: The contractor introduced the Tank 900 Cable Conveyor. Thanks to its compact design, the machine could move flexibly through the confined trench. Its integrated “travel + pull” function allowed the conveyor to advance inside the trench while simultaneously laying the cable – no additional towing device was needed, achieving true “pulling while moving”.
Results:
The equipment was easy to operate and required only a small crew to complete the entire laying process.
Installation time was shortened by 40%.
Cable damage due to dragging was eliminated.
The entire operation was safe and smooth, earning high recognition from the project owner.