The Pusher Transmitter 600 Cable pusher delivers up to 3,800 N of pulling force for 10–100 mm cables. Panel and remote control, adjustable speed, and synchronized multi-unit operation support efficient cable installation.
The Pusher Transmitter 600 Cable pusher is an electric cable conveyor with panel, remote, and synchronized multi-unit control. Its 1,500 W drive provides up to 3,800 N of pulling force for cables from 10 to 100 mm, with four preset gears and stepless speed adjustment for controlled installation.



| Model | Conveyor600 Transmitter |
| Power Supply | AC 380 V standard; AC 220 V customizable |
| Motor Power | 1,500 W |
| Control Methods | Control panel, remote control, and synchronized multi-unit control |
| Speed Adjustment | Four preset gears with stepless adjustment |
| Speed Range | 4–22 m/min |
| Recommended Operating Speed | 10–16 m/min (gears 2 and 3) |
| Maximum Pulling Force | 3,800 N |
| Cable Diameter Range | 10–100 mm |
| Dimensions (L × W × H) | 74 × 46.5 × 55.5 cm |
| Net Weight | 86 kg |
| Feature | How It Helps |
|---|---|
| Transmitter Control System | An external antenna and protected control panel support reliable remote operation around the work site. |
| Flexible Speed Adjustment | Four gears and stepless control provide a 4–22 m/min range for different cable and route conditions. |
| Multi-Unit Synchronization | The unified control module coordinates several conveyors along longer cable routes. |
| Compact and Portable | The 86 kg body is easier to position in tunnels, manholes, and restricted installation areas. |
| Wide Cable Compatibility | Handles cable diameters from 10 to 100 mm for power, telecommunications, and industrial work. |
| Typical Applications |
|
It is designed for cable diameters from 10 to 100 mm.
The machine provides four preset gears with stepless adjustment across a 4–22 m/min range. Gears 2 and 3 provide a recommended speed of 10–16 m/min.
Yes. It supports control-panel and remote operation through its transmitter system.
Yes. The unified control module supports synchronized multi-unit operation.
We are not just an equipment supplier, but a cable laying solution provider. We design customized equipment and tools tailored to your project needs, making your construction simpler, more efficient, and easier to control.

1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
Please submit the form below. Your download will start automatically after successful submission.