The LayPro 900 Strengthen Cable pusher uses dual 1,800 W motors to deliver 8,000 N of pulling force for 20–240 mm cables. Remote control and synchronized operation support demanding cable projects.
The cable conveyor 900 LayPro Strengthen Cable pusher is an industrial cable conveyor with dual 1,800 W copper-core motors and up to 8,000 N of pulling force for cables from 20 to 240 mm. Panel, remote, and synchronized control support demanding installation routes.



| Model | LayPro 900 Strengthen |
| Power Supply | AC 380 V standard; AC 220 V customizable |
| Motor Power | 1,800 W × 2 |
| Speed Range | 0–26 m/min |
| Recommended Speed | 10–16 m/min |
| Maximum Pulling Force | 8,000 N |
| Cable Diameter | 20–240 mm |
| Dimensions | 107 × 57 × 53 cm |
| Net Weight | 214 kg |
| Feature | How It Helps |
|---|---|
| Strengthened Dual-Motor Drive | Two 1,800 W motors provide 8,000 N for large cables. |
| Flexible Control | Panel, remote, and synchronized operation support complex routes. |
| Wide Cable Range | Handles 20–240 mm cables. |
| Adjustable Speed | Four gears and stepless control support smooth starts and stops. |
| Typical Applications |
|
It is designed for cable diameters from 20 to 240 mm.
Four gears and stepless adjustment provide a 0–26 m/min range, with 10–16 m/min recommended in gears 2 and 3.
Yes. Operators can use the onboard control panel or wireless remote control.
Yes. Synchronized control supports coordinated operation along longer cable routes.
We are not just an equipment supplier, but a cable laying solution provider. We design customized equipment and tools tailored to your project needs, making your construction simpler, more efficient, and easier to control.

1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
Project Introduction Tanzania, a premier gold-mining hub in East Africa, is renowned for its complex gold ore deposits and stringentbeneficiation
Project Introduction Tanzania, a premier gold-mining hub in East Africa, is renowned for its complex gold ore deposits and stringentbeneficiation
Please submit the form below. Your download will start automatically after successful submission.