Tank 900 crawler cable conveyor: maximum conveying force 8000 N, rated conveying force 6000 N, conveying speed 4-20 m/min and travel speed 0-40 m/min for 20-240 mm cables. Gasoline and diesel versions have different dimensions and weights.
The Tank 900 Crawler Cable Conveyor combines crawler travel with cable conveying. It provides a maximum conveying force of 8000 N and a rated conveying force of 6000 N for 20-240 mm cables. Conveying speed is 4-20 m/min; travel speed is 0-40 m/min. Gasoline and diesel versions use a 60 V range-extender generator.



| Model | Tank 900 Crawler Cable Conveyor |
| Power System | 60 V range-extender generator; gasoline or diesel version |
| Travel Speed | 0-40 m/min |
| Maximum Conveying Force | 8000 N |
| Rated Conveying Force | 6000 N |
| Conveying Speed | 4-20 m/min |
| Recommended Conveying Speed | 10-16 m/min (gears 2 and 3) |
| Cable Diameter | 20-240 mm |
| Speed Adjustment | Stepless adjustment |
| Control Methods | Control panel and remote control |
| Dimensions – Gasoline Version | 132 x 90 x 100 cm |
| Net Weight – Gasoline Version | 450 kg |
| Dimensions – Diesel Version | 147 x 90 x 100.5 cm |
| Net Weight – Diesel Version | 503 kg |
| Feature | How It Helps |
|---|---|
| Dual Operation Modes | Switch between crawler travel and cable conveying for transport, positioning, and installation. |
| All-Terrain Crawler Chassis | Tracked mobility supports work on slopes, rough ground, and challenging construction sites. |
| Independent Speed Ranges | Crawler mode reaches 0-40 m/min, while conveyor mode provides 4-20 m/min controlled cable movement. |
| Wide Cable Capacity | Handles cable diameters from 20 to 240 mm for medium- and large-cable projects. |
| Wireless Control | Panel and remote operation help crews maintain visibility and safe positioning around the machine. |
| Typical Applications |
|
It is designed for cable diameters from 20 to 240 mm.
Crawler mode moves and positions the machine at speeds up to 40 m/min. Conveyor mode controls cable movement across a 4-20 m/min range.
Yes. The crawler chassis is designed for complex terrain and uneven work sites.
Yes. It supports both onboard panel control and wireless remote operation.
We are not just an equipment supplier, but a cable laying solution provider. We design customized equipment and tools tailored to your project needs, making your construction simpler, more efficient, and easier to control.

1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
Introduction 这是示例文本,单击 “编辑” 按钮更改此文本。 Applicable materials Beneficiation Classification Flotation separation By utilizing the difference in hydrophobicity ofmineral surfaces, target minerals
Please submit the form below. Your download will start automatically after successful submission.