The cable conveyor 900 Mini Cable pusher combines dual 1,500 W motors with 6,000 N of force for 20–180 mm cables. Its compact design, remote control, and adjustable speed suit confined cable-installation sites.
The cable conveyor 900 Mini Cable pusher is a compact electric cable pusher for confined installation spaces. Dual 1,500 W copper-core motors deliver up to 6,000 N of pulling force for cables from 20 to 180 mm, with panel, remote, and synchronized control.



| Model | 900 Mini Version |
| Power Supply | AC 380 V standard; AC 220 V customizable |
| Motor Power | 1,500 W × 2 |
| Speed Range | 4–26 m/min |
| Recommended Speed | 10–26 m/min (gears 2 and 3) |
| Maximum Pulling Force | 6,000 N |
| Cable Diameter Range | 20–180 mm |
| Dimensions | 107.4 × 47.4 × 46 cm |
| Net Weight | 182 kg |
| Feature | How It Helps |
|---|---|
| Compact Design | Fits through 60 cm manholes and works in restricted spaces. |
| Dual-Motor Drive | Two copper-core motors provide stable 6,000 N performance. |
| Flexible Control | Panel, remote, and synchronized controls support different site layouts. |
| Adjustable Speed | Four gears and stepless control match different cable-laying conditions. |
| Typical Applications |
|
It is designed for cable diameters from 20 to 180 mm.
Four gears and stepless adjustment provide a 4–26 m/min range.
Yes. Operators can use the onboard control panel or wireless remote control.
Yes. Synchronized control supports coordinated operation along longer cable routes.
We are not just an equipment supplier, but a cable laying solution provider. We design customized equipment and tools tailored to your project needs, making your construction simpler, more efficient, and easier to control.

Introduction 这是示例文本,单击 “编辑” 按钮更改此文本。 Applicable materials Beneficiation Classification Flotation separation By utilizing the difference in hydrophobicity ofmineral surfaces, target minerals
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
Please submit the form below. Your download will start automatically after successful submission.