The Pusher 400 Cable pusher combines a 2,200 W copper-core motor with 3,600 N of pulling force for 10–100 mm cables. Its compact 77 kg design and constant 26 m/min speed suit confined spaces and synchronized installations.
The Pusher 400 Cable pusher is a compact electric cable conveyor designed for straightforward, constant-speed cable installation. Its 2,200 W copper-core motor delivers up to 3,600 N of pulling force for cables from 10 to 100 mm, while the 77 kg body is easy to position in tunnels, manholes, and other restricted areas.
During operation, the motor transfers power through a reduction gearbox to the rubber conveying components. Adjustable clamping pressure creates stable friction, allowing one or more units to push the cable smoothly at a constant speed.



| Model | Conveyor400 |
| Power Supply | AC 380 V standard; AC 220 V customizable |
| Motor Power | 2,200 W copper-core motor |
| Control Method | Switch control |
| Conveying Speed | 26 m/min constant speed |
| Maximum Pulling Force | 3,600 N |
| Cable Diameter Range | 10–100 mm |
| Dimensions (L × W × H) | 74 × 42 × 56 cm |
| Net Weight | 77 kg |
| Feature | How It Helps |
|---|---|
| Compact and Portable | The 77 kg body is easier to transport and position in tunnels, manholes, and restricted work areas. |
| Constant-Speed Operation | A fixed 26 m/min conveying speed supports consistent operation and straightforward multi-unit coordination. |
| Simple Switch Control | Direct switch operation reduces setup complexity and makes the machine easy to use. |
| Durable Cable Contact | Wear-resistant rubber blocks provide stable grip and help prevent cable slippage. |
| Multi-Unit Capability | Multiple Pusher 400 units can be arranged along longer routes to provide distributed thrust. |
| Typical Applications |
|
It is designed for cable diameters from 10 to 100 mm.
No. This model operates at a constant conveying speed of 26 m/min.
AC 380 V is standard, and an AC 220 V version can be customized.
Yes. Multiple units can be positioned along a cable route to provide distributed conveying force.
We are not just an equipment supplier, but a cable laying solution provider. We design customized equipment and tools tailored to your project needs, making your construction simpler, more efficient, and easier to control.

1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
Introduction 这是示例文本,单击 “编辑” 按钮更改此文本。 Applicable materials Beneficiation Classification Flotation separation By utilizing the difference in hydrophobicity ofmineral surfaces, target minerals
Please submit the form below. Your download will start automatically after successful submission.