The Apex No.7 Optical Cable Tractor is a gasoline-powered optical cable tractor featuring a vibrant green body with two large wheels and top-mounted handle. Designed for telecom field operations, it delivers 4200N pulling force with dual control options (panel + remote) for efficient cable installation.
Optional Accessories
| Model | Apex No.7 Optical Cable Tractor |
| Power System | Premium gasoline engine |
| Motor Power | 1200W |
| Pulling Force | 4200N (max) |
| Control Methods | Panel buttons + wireless remote |
| Transmission | Reinforced crawler belt |
| Speed Range | 0-80m/min |
| Speed Adjustment | 4-gear + stepless |
| Clamping System | Quick-release mechanism |
| Max Cable Opening | 5cm |
| Cable Compatibility | 4-288 core fibers |
| Dimensions | 95×60×80cm |
| Weight | 115kg |
Features & Advantages
Core Features
Dual-Speed Control
Instant operation via panel or remote
Precision Speed Control
4-gear + stepless adjustment
One-Touch Switching
Push-pull mode transition
Cable Protection
Non-damaging reinforced crawler
Portable Design
Compact 115kg construction
Technical Advantages
High-Efficiency Engine
4200N maximum pulling capacity
Wide Speed Range
0-80m/min precise control
Quick Deployment
Instant start/stop functionality
Versatile Application
Adapts to multiple scenarios
Applications
Long-distance fiber optic deployments
Underground conduit installations
Telecom maintenance projects
Remote area cable pulling
1. Project Core Challenges The 110kV Guoyang smart substation is built to optimize local power grid framework and supply power
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without municipal
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects, this
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in Lanzhou Honggu
Project Introduction Tanzania, a premier gold-mining hub in East Africa, is renowned for its complex gold ore deposits and stringentbeneficiation
Introduction 这是示例文本,单击 “编辑” 按钮更改此文本。 Applicable materials Beneficiation Classification Flotation separation By utilizing the difference in hydrophobicity ofmineral surfaces, target minerals