8 Ton Diesel Winch: rated pulling force 80 kN at 5.9 m/min, 4 forward and 2 reverse gears, shaft drive and mechanical brake. Dimensions 117 x 59 x 57 cm; net weight 174 kg.
This 8T diesel winch is a robust and reliable piece of equipment designed for heavy – duty pulling and lifting tasks. Manufactured by keepapexpower, it combines high – performance capabilities with user – friendly features, making it suitable for a wide range of applications, especially in mountainous and field construction environments.



Applications:
Power Engineering
Underground cable installations in pipelines, utility tunnels, and cable trenches with precise tension control.
Transportation & Energy Infrastructure
High-speed rail stations, rail transit systems, new energy power plants, and large oil refineries.
Large Infrastructure Projects
Main power cable installation for nuclear power plants, hydropower stations, and high-rise buildings.
Long-Distance Power Transmission
Direct-burial cable laying and overhead cable-tray installation with controlled pulling force.
Power Construction
Efficient deployment of power cables, fiber-optic cables, and wiring systems across construction sites.
New Energy
Cable installation for wind, hydropower, and solar energy projects.
| Model | 8 Ton Diesel Winch |
| Power System | Diesel |
| Rated Pulling Force | 80 kN |
| Gears | 4 forward + 2 reverse |
| Forward Gear 1 | 80 kN at 5.9 m/min |
| Forward Gear 2 | 50 kN at 11.4 m/min |
| Forward Gear 3 | 38 kN at 15.4 m/min |
| Forward Gear 4 | 20 kN at 28.3 m/min |
| Reverse Gear 1 | 5.3 m/min |
| Reverse Gear 2 | 8.9 m/min |
| Control Method | Gearbox |
| Braking Method | Mechanical brake |
| Transmission | Shaft drive |
| Dimensions | 117 x 59 x 57 cm |
| Net Weight | 174 kg |
This product is the diesel version, with a rated pulling force of 80 kN. The operating force and speed depend on the selected gear.
Pulling Force and Speed at Different Gears
Forward Gear 1: 80 kN at 5.9 m/min.
Forward Gear 2: 50 kN at 11.4 m/min.
Forward Gear 3: 38 kN at 15.4 m/min.
Forward Gear 4: 20 kN at 28.3 m/min.
Reverse Gear 1: 5.3 m/min.
Reverse Gear 2: 8.9 m/min.
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
Project Introduction Tanzania, a premier gold-mining hub in East Africa, is renowned for its complex gold ore deposits and stringentbeneficiation
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
Please submit the form below. Your download will start automatically after successful submission.