Heavy-duty 80 kN electric capstan winch with an 11 kW copper-core motor, 0–20 m/min stepless speed control, remote operation, and automatic power-off braking.
The Capstan Winch Power Arrow 8 is a heavy-duty electric cable pulling winch engineered for ultra-high-voltage transmission, long-distance cable installation, and major infrastructure projects. Its 80 kN pulling force, 11 kW copper-core motor, stepless speed control, and automatic power-off braking provide powerful, controlled, and reliable operation.



Applications:
Power Engineering
Underground cable installations in pipelines, utility tunnels, and cable trenches with precise tension control.
Transportation & Energy Infrastructure
High-speed rail stations, rail transit systems, new energy power plants, and large oil refineries.
Large Infrastructure Projects
Main power cable installation for nuclear power plants, hydropower stations, and high-rise buildings.
Long-Distance Power Transmission
Direct-burial cable laying and overhead cable-tray installation with controlled pulling force.
Power Construction
Efficient deployment of power cables, fiber-optic cables, and wiring systems across construction sites.
New Energy
Cable installation for wind, hydropower, and solar energy projects.
| Model | Power Arrow 8 |
| Maximum Pulling Force | 80 kN |
| Speed Range | 0–20 m/min (stepless adjustment) |
| Motor Power | 11 kW premium copper-core motor |
| Power Supply | AC 380 V |
| Control Methods | Control panel and wireless remote control |
| Safety Feature | Automatic braking when power is cut off |
| Dimensions (L×W×H) | 125 × 75 × 55 cm |
| Net Weight | 550 kg |
| High Pulling Capacity | Delivers up to 80 kN for demanding cable pulling projects. |
| Stepless Speed Control | Provides precise control across the 0–20 m/min range. |
| Dual Control | Supports local panel operation and wireless remote control. |
| Power-Off Braking | Stops the winch automatically during a power interruption. |
| Heavy-Duty Transmission | Thickened wear-resistant drum, anti-vibration shaft drive, and reinforced gearbox. |
| Typical Applications | Ultra-high-voltage power lines; long-distance communication cable installation; offshore wind-farm cabling; major infrastructure projects. |
80 kN.
Yes. The machine provides 0–20 m/min (stepless adjustment) for controlled operation.
Ultra-high-voltage power lines; long-distance communication cable installation; offshore wind-farm cabling; major infrastructure projects.
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
Please submit the form below. Your download will start automatically after successful submission.