Torque Master 5 Diesel Capstan Winch: rated pulling force 50 kN at 4.5 m/min, 4 forward and 2 reverse gears, shaft drive and mechanical brake. Dimensions 110 x 58 x 58 cm; net weight 157 kg.
The Capstan winch Torque Master 5 Diesel version is a heavy-duty cable pulling machine featuring a distinctive teal body with black/white engine components. Designed for challenging environments, it delivers 50 kN rated pulling force through reliable shaft transmission, making it ideal for mountainous and remote construction projects.



Applications:
Power Engineering
Underground cable installations in pipelines, utility tunnels, and cable trenches with precise tension control.
Transportation & Energy Infrastructure
High-speed rail stations, rail transit systems, new energy power plants, and large oil refineries.
Large Infrastructure Projects
Main power cable installation for nuclear power plants, hydropower stations, and high-rise buildings.
Long-Distance Power Transmission
Direct-burial cable laying and overhead cable-tray installation with controlled pulling force.
Power Construction
Efficient deployment of power cables, fiber-optic cables, and wiring systems across construction sites.
New Energy
Cable installation for wind, hydropower, and solar energy projects.
| Model | Torque Master 5 Diesel version |
| Power System | Diesel |
| Rated Pulling Force | 50 kN |
| Gears | 4 forward + 2 reverse |
| Forward Gear 1 | 50 kN at 4.5 m/min |
| Forward Gear 2 | 26 kN at 8.5 m/min |
| Forward Gear 3 | 20 kN at 11 m/min |
| Forward Gear 4 | 10 kN at 23 m/min |
| Reverse Gear 1 | 3.5 m/min |
| Reverse Gear 2 | 9 m/min |
| Control Method | Gearbox |
| Braking Method | Mechanical brake |
| Transmission | Shaft drive |
| Dimensions | 110 x 58 x 58 cm |
| Net Weight | 157 kg |
Gear Performance
• Forward Gear 1: 50KN at 4.5m/min
• Forward Gear 2: 26KN at 8.5m/min
• Forward Gear 3: 20KN at 11m/min
• Forward Gear 4: 10KN at 23m/min
• Reverse Gear 1: 3.5m/min
• Reverse Gear 2: 9m/min
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in