Model: Hercules No.3
Max Traction Force: 30KN
Weight: 345kg
The Winch TorqueMaster No. 3 featuring a robust green base with twin drums and top-mounted motor. Designed for demanding cable operations, it delivers 30KN pulling force with precision speed control, making it ideal for power line and telecommunication projects.



Applications:
Power Engineering
Underground cable installations in pipelines, utility tunnels, and cable trenches with precise tension control.
Transportation & Energy Infrastructure
High-speed rail stations, rail transit systems, new energy power plants, and large oil refineries.
Large Infrastructure Projects
Main power cable installation for nuclear power plants, hydropower stations, and high-rise buildings.
Long-Distance Power Transmission
Direct-burial cable laying and overhead cable-tray installation with controlled pulling force.
Power Construction
Efficient deployment of power cables, fiber-optic cables, and wiring systems across construction sites.
New Energy
Cable installation for wind, hydropower, and solar energy projects.
| Model | Hercules No.3 |
| Traction Force | 30KN (max) |
| Power | 7.5KW copper-core motor |
| Speed Range | 0-20m/min (stepless adjustment) |
| Force-Speed Profile | 30KN at 12.7m/min / 25KN at 16m/min / 20KN at 20m/min |
| Dimensions | 135×74×37cm |
| Weight | 345kg |
Features & Advantages
Core Features
Dual-Drum Design
Enhanced cable handling capacity
Electromagnetic Brake
Instant stop safety system
Synchronous Control
Coordinates with rear-line equipment
Self-Tensioning System
Reduces manual labor
Heavy-Duty Construction
• Thickened wear-resistant drums
• Shock-proof shaft transmission
• Industrial-grade gearbox
Technical Advantages
High-Efficiency Motor
Copper-core for stable 30KN performance
Precision Speed Control
Full 0-20m/min range
Durable Transmission
Anti-vibration design prevents slippage
Low Maintenance
Reinforced components for long service life
Applications
Power transmission line construction
Telecommunication cable deployment
Industrial cable pulling operations
1. Project Core Challenges A large-scale ground photovoltaic power station in Middle East desert needs laying thousands of kilometers of
1. Project Core Challenges This Southeast Asian archipelago island power grid upgrade covers dozens of remote small islands without
1. Project Core Challenges As one of China’s first batch of Shagehuang desert new energy peak-regulation power plant projects,
1. Project Core Challenges Xiangtang substation is a key power hub connecting multiple 110kV &35kV power nodes in
Please submit the form below. Your download will start automatically after successful submission.